
The SAEclimber P08 MCWP the smallest MCWP using a strong tubular mast section, light and extremely quick in erection as well as easy in the use. This mast climber can be erected in less than a day, 18 m long by 30 m high. about 16 man hours to mount a facade of 540 square meters. Available in single or twin mast version. Available in single phase version. It is the perfect choice for renovations and painting jobs. Mast compatible with E05 and PH5 using the tubular mast version on request.
Fast assembly and easy mobility.
Very easy to use.
Minimal space required (can be assembled where other types of scaffolding cannot be installed).
Option to operate with single-phase electrical power.
Ideal for all light work such as painting, repairs, renovations, etc.
Available with Industry 4.0 remote control for faults and operation.
50 m
(*) Greater heights available on request
6 m/min
Single mast: 5,8 m
Twin mast: 18,1 m
Single mast: 500 kg
Twin mast: 1000 kg